Energoprojekt holding
Corporate brand
UnclaimedEnergoprojekt holding is a Serbian engineering and construction group with international experience in energy, infrastructure, buildings, industry, water management, and information technology.
Last updated August 31, 2026
AI crawler reads
No AI crawler has read this profile yet.
Overview
Energoprojekt holding a.d. Beograd is a Serbian engineering, construction, and project-development group headquartered in Belgrade. Established on 11 July 1951 under the Yugoslav authorities, the organization was initially conceived as a consulting enterprise but gradually developed into a diversified holding company with subsidiaries and joint ventures covering energy, industrial facilities, architecture, infrastructure, environmental systems, water management, construction, and information technology. The company’s early development took place during Yugoslavia’s post-war industrialization. Energoprojekt became associated with large technically demanding projects in Yugoslavia and later with international work in countries connected to the Non-Aligned Movement. This international orientation became a defining characteristic of the group: its activities extended beyond the Balkans into Africa, the Middle East, Asia, South America, and several European markets. The company’s portfolio has included power generation, hydropower and water infrastructure, electricity transmission and distribution, industrial plants, civil engineering, high-rise and commercial construction, and specialist engineering services. Energoprojekt operates through a network of specialized companies. Energoprojekt Hidroinženjering focuses on hydropower, water-supply systems, irrigation, and related engineering. Energoprojekt Entel works in energy engineering, including power plants and electricity transmission and distribution. Energoprojekt Industrija develops industrial plants and facilities, while Energoprojekt Urbanizam i arhitektura provides architectural, urban-planning, engineering, and construction services. Energoprojekt Visokogradnja and Energoprojekt Niskogradnja address building construction, civil engineering, infrastructure, and associated installations. Energoprojekt Oprema supplies and executes projects in energy, water management, and industry, and Energoprojekt Energodata represents the group’s information-technology activities. The group has also historically included Energoprojekt Garant, an insurance subsidiary. Representative projects associated with the group include the Iron Gate I Hydroelectric Power Station on the Danube, the Bajina Bašta dam and power plant, power-generation facilities at Obrenovac and Obilić, and power plants in Qatar. In architecture and building construction, the company has been involved in prominent Belgrade projects including Belgrade Arena and the Hyatt Regency Belgrade, as well as projects outside Serbia such as a residence in Harare. These projects illustrate the group’s broad positioning as an integrated engineering and construction provider rather than a narrowly focused contractor. Energoprojekt was admitted to the regulated market of the Belgrade Stock Exchange on 18 July 2007. Ownership changed significantly in July 2017, when Serbian construction company Napred razvoj became the majority stakeholder following months of negotiations. Later that year, the new majority shareholder decided to sell Energoprojekt Garant to Slovenian insurer Sava Osiguranje. Energoprojekt remains associated with the Serbian construction and engineering sector and retains an international project profile, although the available reference material does not establish a complete current subsidiary structure, management roster, or official corporate website.
History
Energoprojekt was founded on 11 July 1951 under the supervision of the Yugoslav authorities. It began as a consulting organization during a period when Yugoslavia was expanding its industrial, energy, transport, and urban infrastructure. The company’s original advisory and design role broadened over time into engineering, construction, equipment, project execution, and the management of specialized subsidiaries. During the socialist Yugoslav period, Energoprojekt participated in major domestic infrastructure programs and developed an international business model. Yugoslavia’s political and economic relationships with countries of the Non-Aligned Movement created opportunities for Yugoslav engineering and construction organizations abroad. Energoprojekt subsequently undertook work across Africa, the Middle East, Asia, South America, and Europe. Its international assignments included energy facilities, water systems, industrial projects, buildings, and other infrastructure. Energy and water infrastructure became central parts of the company’s technical identity. The group was involved in the Iron Gate I Hydroelectric Power Station near Kladovo, developed jointly with the Institute of Hydroelectrical Researches in Bucharest between 1956 and 1960, and in the Bajina Bašta dam and power plant. It also built or participated in power facilities at Obrenovac and Obilić and carried out two power-plant projects in Qatar. These activities were complemented by engineering in electricity transmission and distribution, industrial installations, water supply, irrigation, and related civil works. Energoprojekt also expanded into architecture and general construction. In Belgrade, projects associated with the group include Belgrade Arena and the Hyatt Regency Belgrade. Outside Serbia, its architectural and construction work included a residence for Robert Mugabe in Harare. The group’s range of subsidiaries allowed it to combine design, engineering, construction, equipment, and information-technology capabilities under one corporate structure. After the dissolution of Yugoslavia, Energoprojekt continued operating from Serbia while maintaining international representation and project activity. Its business structure came to include companies specializing in hydropower and water engineering, architecture and urban planning, energy engineering, industrial facilities, high-rise and general construction, civil engineering, equipment, information technology, and insurance. The group thus evolved from a consulting company into a broad engineering and construction holding. A major corporate milestone occurred on 18 July 2007, when Energoprojekt holding was admitted to the regulated market of the Belgrade Stock Exchange. The company later became associated with the exchange’s BELEX15 and BELEXline indices. Ownership changed in July 2017 after months of negotiations, when Serbian construction company Napred razvoj became the majority stakeholder. In November 2017, the new majority shareholder decided to sell Energoprojekt Garant to Slovenian insurer Sava Osiguranje. The reference material confirms the group’s continuing presence and broad historical project portfolio but does not provide a sufficiently current account of its executive leadership, complete ownership structure, or official website.
- 2017
Napred razvoj acquired majority control
[1]Serbian construction company Napred razvoj became the majority stakeholder after an extended negotiation process.
- 2017
Insurance subsidiary divestment announced
[1]Napred razvoj decided to sell Energoprojekt Garant to Slovenian insurance company Sava Osiguranje.
- 2007
Admission to the Belgrade Stock Exchange regulated market
[1]Energoprojekt holding was admitted to the regulated market of the Belgrade Stock Exchange on 18 July 2007.
- 1960
Iron Gate I project period concluded
[1]The reference material identifies 1960 as the end of the stated design period for the Iron Gate I Hydroelectric Power Station.
- 1956
Iron Gate I project period began
[1]Energoprojekt participated in the design of the Iron Gate I Hydroelectric Power Station near Kladovo, in cooperation with a Romanian hydropower research institute.
- 1951
Energoprojekt founded
[1]Energoprojekt was established on 11 July 1951 under the supervision of the Yugoslav authorities, initially as a consulting organization.
Products and positioning
A diversified Serbian engineering and construction holding company positioned around multidisciplinary delivery of energy, infrastructure, industrial, architectural, environmental, and information-technology projects in domestic and international markets.
Energy and water engineering
Hydropower and water infrastructure
Through Energoprojekt Hidroinženjering and related capabilities, the group has worked on hydropower plants, dams, water-supply systems, irrigation, and associated engineering. Its historical portfolio includes participation in the Iron Gate I Hydroelectric Power Station and the Bajina Bašta dam and power plant. These activities combine hydraulic engineering, civil works, infrastructure planning, and project execution.
Energy engineering
Power plants and electricity networks
Energoprojekt Entel represents the group’s specialist energy-engineering activities, including power plants and electricity transmission and distribution. The wider group has been associated with power-generation projects in Serbia and Qatar, as well as technical work supporting electricity infrastructure and energy installations.
Industrial engineering
Industrial plants and facilities
Energoprojekt Industrija focuses on engineering for industrial plants and facilities. Its role within the holding complements the energy, construction, and equipment businesses, enabling the group to address industrial installations and larger multidisciplinary projects rather than limiting its activities to conventional building construction.
Architecture and construction
Buildings, architecture, and urban planning
Energoprojekt Urbanizam i arhitektura, together with the group’s building-construction subsidiaries, covers architectural design, urban planning, engineering, and construction. Associated projects include Belgrade Arena and the Hyatt Regency Belgrade, illustrating the group’s participation in major commercial, public, and urban-development works.
Infrastructure construction
Civil engineering and infrastructure construction
Energoprojekt Visokogradnja and Energoprojekt Niskogradnja provide building, civil-engineering, infrastructure, and industrial or energy-installation capabilities. Energoprojekt Oprema adds construction and equipment expertise in energy, water management, and industry, supporting delivery of complex projects that require multiple technical disciplines.
Information technology
Information-technology services
Energoprojekt Energodata represents the group’s information-technology activities. The available reference material identifies IT as one of the holding’s operating fields but does not provide a current breakdown of products, platforms, or service lines.
Brand decisions
2017
Change in majority ownershipM&ABackground
Following months of negotiations, Serbian construction company Napred razvoj pursued control of Energoprojekt holding.
Action taken
Napred razvoj became the company’s majority stakeholder in July 2017.
Aftermath
The ownership change placed Energoprojekt under a new majority shareholder and was followed by a decision to divest the insurance subsidiary Energoprojekt Garant.
2017
Sale of Energoprojekt GarantM&ABackground
After Napred razvoj became the majority shareholder, the group reviewed the position of its insurance subsidiary.
Action taken
Napred razvoj decided in November 2017 to sell Energoprojekt Garant to Slovenian insurer Sava Osiguranje.
Aftermath
The decision reduced the group’s exposure to insurance and represented a post-acquisition portfolio change.
2007
Entry into the regulated equity marketStrategyBackground
Energoprojekt was transitioning from a historically Yugoslav engineering organization into a Serbian corporate group operating through subsidiaries and joint ventures.
Action taken
The holding was admitted to the regulated market of the Belgrade Stock Exchange on 18 July 2007.
Aftermath
The company became part of Serbia’s public-equity market and was subsequently included in the BELEX15 and BELEXline indices.
Sources2 sources
Cite this profile: Cite the canonical profile. /brand-wiki/energoprojekt-holding · Editorial policy · How profiles are compiled