Industrikraft Midt-Norge
Corporate brand
UnclaimedIndustrikraft Midt-Norge was a Norwegian energy company established around plans for a natural-gas-fired thermal power plant at Fiborgtangen in Levanger Municipality.
Last updated August 25, 2026
AI crawler reads
No AI crawler has read this profile yet.
Overview
Industrikraft Midt-Norge was a Norwegian energy company associated with a proposed large-scale thermal power project at the Fiborgtangen industrial site in Levanger Municipality. The project was intended to use natural gas from the Haltenbanken area as its principal fuel, with biofuel also envisaged as a supplementary source. Its development concept reflected the intersection of Norwegian industrial power demand, offshore natural-gas resources, regional electricity supply, and the energy needs of the Norske Skog Skogn paper mill located at Fiborgtangen. The planned facility was designed around two generating units with a combined electrical capacity of approximately 800 megawatts. The proposed annual electricity output was about 6.4 terawatt-hours. A small part of that production, approximately 0.2 terawatt-hours in energy terms, was intended to be delivered as process steam for the co-located Norske Skog Skogn paper mill. The integration of electricity generation and industrial steam supply was therefore a central feature of the proposal rather than an incidental benefit. The project also depended on new gas-transport infrastructure. A pipeline would have been required to connect the gas landing area at Tjeldbergodden in Møre og Romsdal with Fiborgtangen, passing northward through the Trondheimsfjord area. This infrastructure requirement linked the proposed plant to wider Norwegian debates about gas use, regional development, emissions, and the role of domestic gas-fired generation in a power system dominated by hydropower. Industrikraft Midt-Norge received a permit to begin construction in 2001. In 2006, the permit was extended so that construction could begin by 2012. However, available reference material states that no decision to commence construction had been made by 2007. The sources supplied for this dossier do not establish whether the plant was ultimately built, whether the permit later expired or was withdrawn, or what the company’s current legal and operating status is. Accordingly, Industrikraft Midt-Norge is best documented as a project company and energy venture associated with a proposed plant, rather than as a confirmed operating power generator. The ownership group included Nord-Trøndelag Elektrisitetsverk, Trondheim Energi, Norske Skog and Statoil. Elkem was also previously an owner but later disposed of its stake. No reliable information in the supplied material identifies current executives, a current website, a stock-market listing, or a continuing operating business. The company’s historical significance lies primarily in the proposed Fiborgtangen development and its intended connection of gas supply, industrial steam, and regional electricity generation.
History
Industrikraft Midt-Norge emerged as an ownership vehicle for a proposed thermal power station at Fiborgtangen in Levanger Municipality, central Norway. The site was associated with the Norske Skog Skogn paper mill, creating an opportunity to combine electricity production with the supply of process steam. The project was designed to use natural gas sourced primarily from Haltenbanken, while allowing for a partial contribution from biofuel. The proposed plant was substantial by Norwegian industrial standards. Its design called for two generators with a combined capacity of around 800 megawatts and estimated annual electricity production of approximately 6.4 terawatt-hours. Around 0.2 terawatt-hours was earmarked for steam production serving the adjacent paper mill. The proposal consequently had both a regional electricity-supply dimension and an industrial-integration dimension. A gas pipeline was an essential part of the development plan. It would have transported gas from Tjeldbergodden in Møre og Romsdal through the Trondheimsfjord region to Fiborgtangen. The need for this connection meant that the power station could not be treated as an isolated construction project; its feasibility depended on upstream gas infrastructure as well as on the plant itself. Industrikraft Midt-Norge obtained permission to begin construction in 2001. The permit was extended in 2006, allowing construction to start by 2012. Nevertheless, the available account records that no decision had been taken to begin construction as of 2007. The supplied sources do not document a subsequent construction start, commissioning, commercial generation, or the final disposition of the permit. They also do not provide sufficient evidence to classify the company definitively as active or defunct today. The ownership structure included Nord-Trøndelag Elektrisitetsverk, Trondheim Energi, Norske Skog and Statoil. Elkem had also been involved as an owner but sold its interest. The company’s documented history is therefore principally the history of a proposed industrial power project and its permitting process. Further research would be required to establish later ownership changes, corporate filings, project cancellation or completion, and any current corporate existence.
- 2007
Construction decision remained pending
[1]Available reference material stated that no decision had been made to start construction as of 2007.
- 2006
Permit extended
[1]The construction permit was extended to allow construction to begin by 2012.
- 2001
Construction permit granted
[1]Industrikraft Midt-Norge received permission to begin construction of the planned thermal power plant at Fiborgtangen.
Products and positioning
A Norwegian industrial-energy project company focused on developing integrated gas-fired electricity and process-steam generation for the Fiborgtangen industrial site.
Thermal electricity generation
Fiborgtangen thermal power plant
The company’s principal documented offering was a planned thermal power station at Fiborgtangen. The design called for two generators with a combined capacity of approximately 800 megawatts and expected annual production of about 6.4 terawatt-hours. Natural gas from Haltenbanken was intended to be the primary fuel, with biofuel included as a possible partial fuel source. The project was also designed to provide process steam to the neighboring Norske Skog Skogn paper mill.
Industrial energy services
Industrial process steam supply
The proposed Fiborgtangen facility was intended to produce approximately 0.2 terawatt-hours of steam-related energy for the co-located Norske Skog Skogn paper mill. This steam component would have connected the power project to the mill’s industrial processes and formed part of the planned integrated energy system.
Sources1 sources
Cite this profile: Cite the canonical profile. /brand-wiki/industrikraft-midt-norge · Editorial policy · How profiles are compiled