Skip to content

Product brand

Unclaimed

Doka is an Austrian international supplier of formwork, scaffolding, engineering, rental and digital solutions for the construction industry.

Last updated October 14, 2026

AI crawler reads

No AI crawler has read this profile yet.

Overview

Doka Group, legally associated with Doka GmbH, is an Austrian construction-technology company specializing in formwork and scaffolding systems. Its equipment and engineering services are used to construct concrete structures across infrastructure, civil engineering, commercial building, residential development, industrial construction, dams, bridges, tunnels and high-rise projects. The company combines the manufacture and sale of reusable formwork equipment with rental, project engineering, site support, maintenance, software and workforce training. Doka is headquartered in Amstetten, Austria, and forms one of the principal businesses of Umdasch Group AG alongside Umdasch The Store Makers and Umdasch Industrial Solutions. The wider corporate group traces its roots to a carpentry business established by Stefan Hopferwieser in 1868. Over subsequent decades, the enterprise expanded into timber processing, metalworking, furniture, household products, hardware and packaging. Under Josef Umdasch, who became managing director in 1949, the business was reorganized and its prefabricated formwork and store-fitting activities developed into important modern divisions. The group was renamed Umdasch KG in 1961 and remained under the direction of the Umdasch family after Josef Umdasch's retirement. The Doka branch emerged in 1958 against the background of major Austrian hydroelectric construction. Large dams and related infrastructure required more efficient alternatives to labor-intensive timber beam formwork. The Amstetten business developed large, reusable formwork panels for projects associated with Donaukraftwerke, the Austrian Danube power-station organization commonly abbreviated as DOKW. The delivery designation and product terminology evolved into the name Doka. This origin shaped the company's long-term focus on systematic, reusable formwork for large concrete structures. Doka began international expansion with a German subsidiary in 1961, followed by operations in Brazil and Kuwait in 1977. It subsequently developed a broad international branch and service network. The company reports approximately 8,400 employees and about 150 branches in 54 countries, although workforce and network figures can change over time. Most formwork production is centered at Amstetten, while three-ply sheets are produced at the company's plant in Banská Bystrica, Slovakia. The acquisition of MFE in 2024 expanded Doka's manufacturing capabilities in Southeast Asia. Its portfolio includes wall, slab, climbing, tunnel, dam and bridge formwork; one-sided wall systems; shoring and falsework; tie systems; scaffolding; planning and design services; equipment rental and sales; maintenance; software; and training. Doka systems have been used on prominent projects including Burj Khalifa, the European Central Bank headquarters, Lotte World Tower, Central Park Tower, Varso Tower, Sydney Metro and other bridges and high-rise developments. These references illustrate the brand's positioning around technically demanding, large-scale and complex construction rather than consumer-facing building products. Digitalization and sustainability have become more prominent elements of the business. At bauma 2025, Doka presented Doka 360, an integrated platform intended to connect formwork planning, ordering, material management and returns. The company has also committed to a net-zero emissions goal for 2040 and states that it is the first formwork and scaffolding company to commit to the Science Based Targets initiative. In 2024, Doka participated through the European concrete-formwork quality association in the development of industry minimum standards for calculating product carbon footprints. The company said that carbon-footprint data under that standard were available for more than 7,000 products. Doka's Russian operations attracted criticism because the company continued generating revenue in Russia from 2021 through 2023 without a publicly documented announcement of a complete withdrawal. In June 2024, LPF CAPITAL LLC became the stated new owner of the Russian organization, and the Russian legal entity formerly known as DOKA RUS LLC was renamed REFORM LLC. The Russian ownership and naming changes were separate from Doka's Austrian parent and international operating structure.

History

Doka's history is connected to the development of the Umdasch Group in Lower Austria. In 1868, Stefan Hopferwieser established a carpentry business in Kollmitzberg. During its first decades, the enterprise diversified into sawmilling, timber products, metal manufacturing, furniture, household appliances, hardware and packaging. Josef Umdasch, who had joined the company's leadership in the late 1930s and became managing director in 1949, led a postwar rebuilding and restructuring effort. His management helped create the foundations for the group's later specialization in prefabricated formwork and store fitting. In 1961, the corporate group adopted the name Umdasch KG. After Josef Umdasch retired, his children Hilde and Alfred Umdasch continued to direct the company. The Doka branch was established in 1958. Its creation reflected the construction demands of large Austrian hydroelectric projects, especially works associated with Donaukraftwerke on the Danube and its tributaries. Conventional timber beam formwork required considerable labor when used for the high walls and large repetitive structures found in dam construction. The Amstetten company therefore developed systematic, reusable timber formwork panels. These products were initially connected with the abbreviation DOKW, derived from Donaukraftwerke and also used in delivery and product terminology. Over time, the term was shortened linguistically to Doka and became the name of the new business. Internationalization started with the creation of a German subsidiary in 1961. The company added operations in Brazil and Kuwait in 1977 and subsequently built an international network of branches and service locations. Doka's operating model developed beyond manufacturing: it combines equipment sales, rental, engineering, project support, maintenance, software and training. This model allows the company to supply both standardized systems and customized solutions for major construction sites. Doka's systems have been associated with many large infrastructure and high-rise projects. Listed examples include Burj Khalifa in Dubai, the European Central Bank building in Frankfurt, Lotte World Tower in Seoul, Central Park Tower in New York, Varso Tower in Warsaw, Exchange 106 in Kuala Lumpur, Sydney Metro, Karlatornet in Gothenburg and the A16 Rotterdam Bridge. The projects span different construction methods and demonstrate the company's focus on high-rise, bridge, tunnel, transport and heavy civil engineering applications. Manufacturing remains centered in Austria, particularly at the Amstetten plant, while the Banská Bystrica facility in Slovakia produces Doka three-ply sheets. The 2024 acquisition of MFE added production capacity in Southeast Asia. The company has also expanded its emphasis on digital tools. Doka 360, shown at bauma 2025, is intended to provide an integrated digital view of planning, ordering, material flows and returns across the formwork process. Sustainability is another recent strategic theme. Doka has announced a goal of net-zero emissions by 2040 and a commitment to the Science Based Targets initiative. In 2024, it supported the development of minimum standards for product-carbon-footprint calculations within the European concrete-formwork sector. The company reported that compliant carbon-footprint information was available for more than 7,000 products. The business has also faced reputational criticism connected with Russia. Doka reportedly continued to earn revenue through Russian operations from 2021 to 2023 without a documented public announcement of a complete withdrawal. In June 2024, LPF CAPITAL LLC became the stated owner of the Russian organization, which changed its legal name from DOKA RUS LLC to REFORM LLC. These developments concerned the Russian entity and should not be treated as evidence that the Austrian Doka group itself changed ownership.

  • 2025

    Doka 360 presented at bauma

    [1]

    Doka introduced an integrated digital platform covering key formwork planning and material-management processes.

  • 2024

    MFE acquisition expands Southeast Asian production

    [1]

    Doka acquired MFE, adding production capabilities in Southeast Asia.

  • 2024

    Product-carbon-footprint standards introduced

    [1]

    Doka supported the introduction of minimum standards for product-carbon-footprint calculations in the European concrete-formwork sector.

  • 1977

    Expansion into Brazil and Kuwait

    [1]

    Doka established operations in Brazil and Kuwait as part of its international growth.

  • 1961

    First German subsidiary opened

    [1]

    Doka began international expansion with a subsidiary in Germany.

  • 1961

    Corporate group renamed Umdasch KG

    [1]

    The wider corporate group adopted the Umdasch KG name.

  • 1958

    Doka branch founded

    [1]

    The Doka business was established to develop systematic reusable formwork for large Austrian hydroelectric projects.

  • 1949

    Josef Umdasch becomes managing director

    [1]

    Josef Umdasch led the postwar rebuilding and restructuring of the family enterprise.

  • 1868

    Hopferwieser carpentry business established

    [1]

    Stefan Hopferwieser founded the business in Kollmitzberg that later became part of the Umdasch corporate history.

Products and positioning

A global construction-technology and equipment specialist positioned around reusable formwork, scaffolding, engineering expertise, rental and digital workflow management for technically complex concrete construction.

  • Formwork

    Wall formwork systems

    Reusable systems for forming vertical concrete walls in building, infrastructure, industrial and civil-engineering projects. Doka's wall-formwork offering includes standard panels as well as solutions for demanding geometries, high loads and restricted-access sites. Engineering and site support accompany equipment supply, rental and maintenance.

  • Formwork

    Slab formwork systems

    Formwork equipment for casting horizontal concrete slabs, floors and decks. The systems are designed for repeated use and can be configured for different spans, load requirements and construction cycles. They are supplied through Doka's combination of equipment sales, rental, planning and technical support.

  • Formwork

    Climbing formwork

    Formwork systems that move upward with a structure as construction progresses. They are particularly relevant to high-rise cores, towers, bridge piers and other vertically advancing concrete structures. Doka provides associated engineering and project services for coordinating climbing sequences and site operations.

  • Civil-engineering formwork

    Tunnel, dam and bridge formwork

    Specialized systems for major civil works, including tunnels, dams and bridges. The bridge range covers cast-in-place balanced-cantilever work, concrete arch bridges and steel-combination bridge formwork. These offerings address complex geometry, repetitive construction stages and the heavy loads associated with infrastructure projects.

  • Temporary works equipment

    Shoring, falsework and tie systems

    Temporary structural-support products used to carry formwork and fresh-concrete loads during construction. Doka also supplies tie systems and related field support, enabling contractors to stabilize, align and reuse formwork assemblies across different site conditions.

  • Scaffolding

    Scaffolding solutions

    Scaffolding equipment and services for construction and related applications. The business serves projects requiring safe access, working platforms and temporary structures, complementing Doka's formwork portfolio and broader site-support model.

  • Digital construction software · 2025

    Doka 360

    An integrated digital platform presented at bauma 2025. Doka describes it as covering central stages of the formwork lifecycle, from planning and ordering through material management and returns. Its purpose is to improve visibility and productivity in equipment-intensive construction workflows.

Controversies

  • 2024

    Russian subsidiary renamed after ownership change

    In June 2024, LPF CAPITAL LLC became the stated owner of the Russian organization. The entity formerly called DOKA RUS LLC was renamed REFORM LLC, and references to Umdasch Group AG and DOKA GMBH LLC were removed from the Russian Unified State Register of Legal Entities.

  • 2023

    Criticism over Russian business activity

    Doka was criticized over reports that its Russian operations continued to generate revenue from 2021 through 2023 without a documented public announcement of a complete withdrawal from the country.

Read more

Brand decisions

  • 2025

    Launch Doka 360Product launch

    Background

    Doka identified digital coordination of planning, ordering and equipment flows as an opportunity to improve construction productivity.

    Action taken

    The company presented Doka 360 at bauma 2025 as an integrated platform for the formwork process.

    Aftermath

    The platform broadened Doka's offering from physical equipment and engineering toward digitally managed construction workflows.

  • 2024

    Acquire MFEM&A

    Background

    Doka sought to broaden its manufacturing footprint and regional capabilities in Southeast Asia.

    Action taken

    Doka acquired MFE, adding production capabilities in the Southeast Asian region.

    Aftermath

    The transaction expanded Doka's manufacturing base beyond its established Austrian and Slovakian production locations.

  • 2024

    Commit to a 2040 net-zero targetStrategy

    Background

    Construction equipment companies face increasing pressure to measure and reduce embodied and operational emissions.

    Action taken

    Doka announced an ambition to achieve net-zero emissions by 2040 and committed to the Science Based Targets initiative.

    Aftermath

    Doka also supported sector-wide product-carbon-footprint calculation standards and reported footprint data for more than 7,000 products.

Recent events

  • Reported

    Doka launches DokaCAD for Revit[3]

    Doka launched DokaCAD for Revit, software for automated formwork planning.

Read more

Sources3 sources

Cite this profile: Cite the canonical profile. /brand-wiki/doka · Editorial policy · How profiles are compiled