Gezhouba Group

Request correction

Corporate brand

Unclaimed

A Chinese state-linked infrastructure and engineering group specializing in hydropower, dams, transport, and civil construction in China and international markets.

Last updated November 4, 2026

AI crawler reads

No AI crawler has read this profile yet.

Overview

Gezhouba Group is a Chinese infrastructure construction and engineering brand headquartered in Wuhan, Hubei. Its core work includes the construction of hydroelectric power stations, dams, roads, bridges, and other civil-engineering infrastructure. The group developed through China’s large-scale water and power construction programs and became closely associated with major hydropower projects, including the Gezhouba Water Control Project and the Three Gorges Dam on the Yangtze River. The company’s domestic portfolio has extended beyond hydropower to transportation, municipal works, environmental projects, and other forms of civil construction. It has participated in construction at major Chinese generating facilities, including the Wudongde hydropower station on the lower Jinsha River. These projects place the group within the broader state-linked Chinese engineering sector, where large contractors combine design, procurement, construction, project management, and overseas delivery capabilities. Gezhouba expanded internationally from the 2000s, particularly through hydropower and infrastructure contracts in Africa, Asia, Latin America, and the Middle East. Its international activities have included power plants and dams in Ethiopia, the Democratic Republic of the Congo, Angola, Kazakhstan, Pakistan, and Argentina. The group reports or is described as operating in more than 60 countries across South Asia, Southeast Asia, the Middle East, Africa, Latin America, and Oceania. The listed operating company associated with the brand is China Gezhouba Group Company Limited. Its largest shareholder has been China Gezhouba Group Corporation, a state-owned enterprise subsidiary of China Energy Engineering Corporation. The brand therefore operates within a broader Chinese state-owned energy and engineering structure rather than as an independent consumer-facing company. Its market positioning is that of a large, technically capable general contractor for complex infrastructure, especially water, hydropower, and overseas development projects. Gezhouba’s identity is built around project execution rather than branded products. Its principal offerings are engineering and construction services, including dam and hydropower construction, civil works, transport infrastructure, and associated project-management capabilities. Major projects can involve long development cycles, government or policy-bank financing, international joint ventures, and substantial environmental and political scrutiny. As a result, the group’s public profile is closely tied to the progress, financing, and social or environmental context of the infrastructure projects in which it participates.

History

Gezhouba Group emerged from China’s large-scale state-led water and power construction system. Its origins are associated with 1970, when Chinese authorities organized construction capabilities around major water-control and hydropower works. The group took its name from the Gezhouba Water Control Project on the Yangtze River, a strategically important early project that helped establish its technical identity. The company’s development was closely connected with the expansion of China’s hydropower infrastructure. It became a major participant in the civil works for the Three Gorges Dam, the country’s largest hydroelectric project and one of the most complex infrastructure programs of its era. Through such work, Gezhouba built experience in river diversion, dam construction, large-scale concrete works, underground structures, power-plant civil engineering, and project coordination. Its domestic activities later broadened to include roads, bridges, municipal infrastructure, environmental works, and other forms of civil engineering. The group also participated in construction at the Wudongde hydropower station on the lower Jinsha River. With an installed capacity of 10.2 gigawatts, Wudongde is one of a series of major hydropower stations developed along the river. Projects of this scale reinforced Gezhouba’s position as a specialist in large water and energy infrastructure rather than a conventional building contractor. From the mid-2000s onward, Gezhouba increased its international activity. In Africa, it delivered or participated in hydropower projects in countries including Ethiopia, the Democratic Republic of the Congo, and Angola. Its Ethiopian work included the 197-megawatt Amerti Neshe Hydroelectric Power Plant, completed in 2011, and the 254-megawatt Genale Dawa III project. The group also participated in early works connected with the Grand Ethiopian Renaissance Dam. In the Democratic Republic of the Congo, it led construction of the 240-megawatt Busanga Dam. In Angola, it became involved in the Caculo Cabaça Hydroelectric Power Station, a 2,172-megawatt project described as one of the largest hydropower developments under construction in Africa. In Asia, the group signed a major Kazakhstan contract in 2010 for a hydroelectric plant on the Chilik River. In Pakistan, it was awarded work in 2014 on a 40-kilometre portion of the Hazara Motorway. These contracts illustrate the group’s move from a primarily domestic water-construction identity toward a broader international infrastructure platform. In Latin America, Gezhouba has led construction of the Cóndor Cliff–La Barrancosa hydroelectric complex in Argentina since 2015 as part of the Represas Patagonia consortium. The project has been affected by financing difficulties and repeated suspensions, with later partial resumption linked to a new financing disbursement. Such episodes reflect the commercial and political risks associated with very large overseas infrastructure projects. Corporate ownership has remained closely connected to China’s state-owned energy and engineering sector. China Gezhouba Group Company Limited has been the listed company associated with the brand, while China Gezhouba Group Corporation has been identified as its largest shareholder. China Gezhouba Group Corporation is itself a subsidiary of China Energy Engineering Corporation. The group’s business model combines domestic state infrastructure work, international engineering and construction contracts, and participation in projects supported by government institutions or policy-bank financing. Today, Gezhouba is best understood as an infrastructure engineering brand and operating group. It does not principally sell consumer products; instead, its offerings are project-based services covering hydropower, dams, transportation, civil works, and related engineering. Its history is therefore measured through major projects, international expansion, corporate integration, and the delivery or suspension of complex infrastructure programs.

  • 2015

    Argentina hydropower complex

    [1]

    The group began leading construction of the Cóndor Cliff–La Barrancosa complex in Argentina through Represas Patagonia.

  • 2014

    Hazara Motorway contract

    [1]

    Gezhouba was awarded construction work on a 40-kilometre section of Pakistan’s Hazara Motorway.

  • 2011

    Completion of Amerti Neshe plant

    [1]

    Gezhouba completed the 197-megawatt Amerti Neshe Hydroelectric Power Plant in Ethiopia.

  • 2010

    Kazakhstan hydropower contract

    [1]

    The group signed a reported 4.97 billion yuan contract for a hydroelectric plant on Kazakhstan’s Chilik River.

  • 1970

    Origins in Chinese water and power construction

    [1]

    The organization’s origins are associated with the formation of construction capabilities for major Chinese water-control and hydropower works.

  • Participation in the Three Gorges Dam

    [1]

    Gezhouba became a principal civil-works contractor for the Three Gorges Dam project on the Yangtze River.

Products and positioning

Large state-linked Chinese infrastructure and engineering contractor with particular strength in hydropower, dams, water-control works, and overseas civil construction.

  • Energy infrastructure

    Hydropower plants

    Gezhouba designs and constructs civil works for large hydroelectric facilities, including dams, diversion systems, tunnels, powerhouses, and associated infrastructure. Its portfolio spans domestic Chinese projects and international developments in Africa, Asia, and Latin America.

  • Water infrastructure

    Dams and water-control projects

    Dam and water-control construction is central to the group’s historical identity. The work can include river regulation, flood-control structures, reservoirs, diversion channels, and other major civil works required for multipurpose water and energy projects.

  • Civil engineering

    Transport infrastructure

    The group undertakes roads, motorways, bridges, and related transport civil works. Its Pakistani Hazara Motorway contract illustrates the expansion of its project portfolio beyond dams and power stations.

  • Public infrastructure

    Municipal and environmental works

    In addition to large energy and transport projects, Gezhouba’s stated business scope includes municipal construction and environmental infrastructure. These activities complement its broader general-contracting and civil-engineering capabilities.

Controversies

  • 2026

    Gezhouba fined over Mulan pumped-storage project not built to standards, drawings

    The Fujian Energy Regulatory Office determined that during construction of the Mulan Pumped-Storage Power Station, Gezhouba did not construct the upper reservoir main dam according to technical standards and did not construct the intake/outlet slope according to design drawings, and fined it 6,708,564.68 yuan. Status: administrative penalty. Entity involved: China Gezhouba Group Co., Ltd.

  • 2019

    Gezhouba Huanjia struggles to recover over RMB 1 billion in prepayments; executives detained in corruption case

    Gezhouba's renewable-resources business subsidiary Gezhouba Huanjia had more than 1 billion yuan in prepayments that could not be recovered; former chairman Chen Xi and general manager Wang Jinping were placed under detention for investigation in 2019, and manager Lü Weijie was sentenced to seven years for embezzling 5.8556 million yuan, exposing internal-control problems at the subsidiary. Gezhouba made large impairment provisions in its environmental-protection business.

Read more

Brand decisions

  • 2015

    International expansion through Argentina hydropower constructionStrategy

    Background

    Gezhouba had expanded beyond China through major overseas hydropower and civil-engineering contracts.

    Action taken

    The group led construction of the Cóndor Cliff–La Barrancosa hydroelectric complex as part of the Represas Patagonia consortium.

    Aftermath

    The project subsequently experienced repeated suspensions and financing-related delays, with partial resumption reported after a later financing disbursement.

  • 2010

    Kazakhstan hydropower project awardOther

    Background

    Kazakhstan sought additional hydroelectric generating capacity on the Chilik River.

    Action taken

    Gezhouba entered a reported 4.97 billion yuan construction contract with Kazakhstan Natural Gas Technology.

    Aftermath

    The award strengthened the group’s international hydropower portfolio in Central Asia.

    Contract value. 4.97 billion yuan (2010 contract award)

Sources7 sources